• SME TE94-251
Provide PDF Format

Learn More

SME TE94-251

  • Catching Up And Holding On
  • standard by Society of Manufacturing Engineers, 06/01/1994
  • Publisher: SME

$9.00$18.00


A METHODOLOGY FOR THE ECONOMICAL DESIGN OF WORKHOLDING SYSTEMS IS PRESENTED. A BACKGROUND IS DEVELOPED BY COMPARING THE GENERAL STATE OF THE ART IN WORKHOLDING TO THAT OF THE EQUIPMENT AND PROCESSES TO WHICH IT IS APPLIED AND BY REVIEWING FUNDAMENTAL PRINCIPLES. ALTERNATIVE WORKHOLDING MEANS ARE EXAMINED, AND WORKHOLDING TECHNOLOGY IS CATAGORIZED INTO FOUR GENERAL LEVELS. EXAMPLES OF THE DESIGN METHODOLOGY, IN BOTH METALCUTTING AND MULTI-PURPOSE APPLICATIONS, ARE GIVEN.

Related Products

SME MS94-218

SME MS94-218

Mobile Manipulation--A Mobile Platform Supporting A Manipulator System For An..

$9.00 $18.00

SME MR99-273

SME MR99-273

The Quantification Of The Depth Of Deformed Layer Using Elemental Analysis For Aspheric Lens Mold Co..

$9.00 $18.00

SME MM900716

SME MM900716

Future Manufacturing Managers: How Must They Change..

$9.00 $18.00

SME MS900342

SME MS900342

Dnc: Factory Floor Data Communications..

$9.00 $18.00