• SME MM930238
Provide PDF Format

Learn More

SME MM930238

  • Silver Bullets Shoot You Dead: Planning For Integrating Technology, Organization And People Change
  • standard by Society of Manufacturing Engineers, 06/01/1993
  • Publisher: SME

$9.00$18.00


HIGH FAILURE RATES FOR NEW TECHNOLOGY RESULT FROM INADEQUATE PLANNING FOR INTEGRATING TECHNOLOGY CHANGE WITH ORGANIZATIONAL AND PEOPLE CHANGE. CHARACTERISTICS OF ADEQUATE INTEGRATIVE PLANNING ARE DESCRIBED. TOOLS DO NOT CURRENTLY EXIST FOR PROVIDING IMMEDIATE AND DETAILED INFORMATION ABOUT LIKELY IMPACTS OF ANY CHANGE IN TECHNOLOGY, ORGANIZATION AND PEOPLE ON OTHER ASPECTS OF THE ORGANIZATIONAL SYSTEM. A NEW TOOL, CALLED ACTION, HAS RECENTLY BEEN DEVELOPED BASED ON CLOSE COLLABORATION OF ACADEMIA AND INDUSTRY. A SELECT INDUSTRY EXPERIENCE WITH THE TOOL IS DESCRIBED.

Related Products

SME MS910319

SME MS910319

Optimal Control Of Path Tracking In Mobile Robots And Automated Guided Vehicles..

$9.00 $18.00

SME MF96-101

SME MF96-101

How To Select The Right Robot For Press To Press Transfer Application..

$9.00 $18.00

SME MR920373

SME MR920373

Theory And Application Of Press Brakes..

$9.00 $18.00

SME MS94-248

SME MS94-248

Metal Cleaning Alternatives In The Non-Cfc Age..

$9.00 $18.00