• NECA 200-2010
Provide PDF Format

Learn More

NECA 200-2010

  • Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI)
  • standard by National Electrical Contractors Association, 2010
  • Publisher: NECA

$20.00$40.00


Describes installation procedures for temporary power at construction sites. It covers the planning, installation, expansion, maintenance, cutover, and removal of temporary power systems operating at 600 volts or less. NECA 200 is approved as an American National Standard (ANS).

Related Products

NECA 120-2012

NECA 120-2012

Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC)..

$20.00 $40.00

NECA 230-2010

NECA 230-2010

Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers..

$20.00 $40.00

NECA 412-2012

NECA 412-2012

Installing and Maintaining Photovoltaic (PV) Power Systems..

$20.00 $40.00

NECA 200-2010

NECA 200-2010

Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (..

$20.00 $40.00