• DOXPUB 09-0019-SOP
Provide PDF Format

Learn More

DOXPUB 09-0019-SOP

  • Scintillation Counter, Beckman LS 6000IC, Operation, Standardization and Maintenance
  • standard by Doxpub, Inc., 08/01/2007
  • Publisher: DOXPUB

$20.00$39.00


Summary:

Describes a procedure for the operation, standardization, and maintenance of the Beckman Liquid Scintillation Counter, LS 6000IC. Includes instructions for cleaning, standardization and maintenance.

Included Sections:

Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures

Included Attachments/Appendices:

Cleaning/Standardization Log

About This Document:

This is not a generic template, it's a 4-page procedure that was actually created and used in the Quality Control operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.

Reasons to Buy:

  • Use it as a starting point for your own documentation project
  • Compare the quality of your documents against your industry peers
  • Learn what other companies in your industry are actually doing

Who Will Benefit:

  • Quality Assurance Managers
  • Manufacturing Managers
  • Quality Control Personnel

Related Products

DOXPUB 09-0113-SOP

DOXPUB 09-0113-SOP

ELISA for the Detection and Quantitation of Rat IgG..

$20.00 $39.00

DOXPUB 12-0017-SOP

DOXPUB 12-0017-SOP

Manufacturing Department Training..

$40.00 $79.00

DOXPUB 09-0239-SOP

DOXPUB 09-0239-SOP

Operation, Maintenance, and Calibration of ATI Orion Model 162 Conductivity Meter for Measurement of..

$30.00 $59.00

DOXPUB 09-0014-SOP

DOXPUB 09-0014-SOP

Product Recall Procedure: USA..

$25.00 $49.00