• AWWA WSC70050
Provide PDF Format

Learn More

AWWA WSC70050

  • Security Infrastructure Improvements at the Birmingham Water Works Board: A Case Study
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Birmingham (Alabama) Water Works Board. Topics covered include: physical security improvements at each facility and supportinginfrastructure;physical security costs to date;system monitoring and response;hazard mitigation measures;security planning and policy; and,moving forward.

Related Products

AWWA JAW10800

AWWA JAW10800

Journal AWWA - Overland Flow for Iron Removal From Potable Water ..

$15.00 $30.00

AWWA C207-94

AWWA C207-94

Steel Pipe Flanges for Waterworks Service - Sized 4 in. Through 144 in. (100mm Through 3600mm)..

$15.00 $30.00

AWWA ACE60041

AWWA ACE60041

Getting Value from Benchmarking: An Investigation of the QualServe Performance Indicator Participant..

$12.00 $24.00

AWWA JTMGT64441

AWWA JTMGT64441

A "Do It Yourself" Strategic Planning Case Study..

$12.00 $24.00