• AWWA MTC61099
Provide PDF Format

Learn More

AWWA MTC61099

  • Challenges and Solutions in Contracting for the Successful Installation of Low Pressure Membrane Systems
  • Conference Proceeding by American Water Works Association, 03/01/2005
  • Publisher: AWWA

$12.00$24.00


Successful implementation of low pressure membrane systems using multiple contracts requiresconsideration of the unique complexities of the technology and the contracting method to addressthese concerns and to limit potential conflicts and pitfalls. This paper reviews the following fourcritical areas of concern that need to be thoughtfully addressed in contracting for successfulimplementation of low pressure membrane systems:identification of scope of supply and contractor interface limits; requirements for component delivery and transfer;commissioning and troubleshooting activities; and,provisions in the case of defective equipment or work.These critical areas of concern are discussed using experiences from the implementation of a60 million-gallon-per-day (MGD) submerged membrane treatment system for the Racine WaterUtility located with Racine, Wisconsin. Includes table.

Related Products

AWWA CSC95023

AWWA CSC95023

The Application of a Calibrated Water Quality Model in a System Wide Disinfection Study..

$12.00 $24.00

AWWA CSC92004

AWWA CSC92004

San Antonio's Billing System Streamlined With Relational Database Technology..

$12.00 $24.00

AWWA ACE54518

AWWA ACE54518

Predicting Yield and Operating Behavior of a Horizontal Well..

$12.00 $24.00

AWWA C563-14

AWWA C563-14

Fabricated Composite Slide Gates..

$41.00 $81.00